
What does the design require?
Confirm the roof form, slope, span and supporting structure with the responsible building professional before ordering.
What specification is being compared?
Ask for the material type, thickness or gauge, coating, profile, dimensions and finish in writing so quotations refer to the same product.
What else completes the roof?
Ridges, valleys, flashings, fasteners, gutters and related pieces should be considered with the main sheets.
How will the order reach the site?
Long sheets need suitable transport, safe unloading and dry storage. Confirm responsibilities before dispatch.
- Design requirement
- Written specification
- Accessories included
- Delivery and offloading plan
Common questions
- Is the cheapest roofing quotation always comparable?
- No. Check that material, dimensions, finish, accessories and delivery scope are the same before comparing totals.
